;
challenges go here
25 Feb, 2021
Requiring slope stabilization and installation of cable net drapery, this $1.47 million project was located in Running Springs along Route 330. Completed in 85 days, this work was completed on the East Fork City Creek bridge. The cable net drapery system was installed utilizing a helicopter to transport and anchor the new drapery systems.
COMPLETED
Road Improvement
Caltrans
Running Springs, CA